Ukrainska Volnytsia LLC
A pig complex for 1,000 sows, 2018–2019
- Gravity manure removal
A gravity system takes manure from under the slatted floor through channels and pipes to the lagoon.
It is built into the building design: gradients, levels and pipe diameters are set before any concrete is poured.
We tie the manure network to the layout of the whole complex, from rooms to the lagoon.
Schematic, not to scale.
A wrong gradient or level is hard and expensive to fix after concreting.
That is why channels, pipes and connection points are designed together with the room layout, floors and ventilation.
The sites where we built this system, with photos from each.
A pig complex for 1,000 sows, 2018–2019
A pig complex for 500 sows, 2018–2019
If the data is sufficient, a preliminary calculation is possible before a site visit.
Send the building size, the stock and the task. The topic “Gravity manure removal” will already be in the form.